What is it?
- A RACI matrix is a grid of activities mapped against the Responsible, Accountable, Consulted and Informed stakeholders.
- Its purpose is to create clarity across roles.
Why is it useful?
- As workplaces become more complex, project-based, and interconnected, clear role definitions are essential.
- A RACI matrix gives teams a practical way to describe multi-project work and how to deliver together effectively.
Objectives
- To help teams clarify individual, team and organizational roles and responsibilities.
- To identify and clarify personal accountabilities.
- To reduce misunderstandings between colleagues.
When would you use it?
- When there is confusion or conflict in a team or project about responsibilities.
- When accountability is unclear and work risks being duplicated or dropped.
Resources required
- Whiteboard, multiple flip chart sheets or large wall space.
- Packs of multi-colour Post-Its.
- Lots of pens.
- An open-plan room with space to walk around.
What does RACI mean?
- Responsible – The person or position doing the activity (the work).
- Accountable – The person ensuring the activity happens. If things go wrong, accountability sits here.
- Consulted – The person who must be asked before a decision or action.
- Informed – The person who needs to know after a decision or action.
Process
1. Choose one activity to focus on
- Decide whether to apply the matrix to a broad process (e.g. product launch) or a very specific issue.
- You can always build multiple charts if needed.
2. Identify activities or tasks
- Brainstorm all steps in the activity or decision-making process.
- Use one colour of Post-It notes to capture these activities and place them vertically in a list.
3. Identify key stakeholders
- Brainstorm all roles or people who need to be involved.
- Use another colour of Post-Its to capture roles and place them horizontally.
- Draw a grid with activities on one axis and roles on the other.
4. Decide: “as is” or “will be”
- Choose whether you are charting the current reality or designing the desired future state.
5. Populate the chart
- Use Post-Its with R, A, C, I to map roles to activities.
- If possible, use different colours for each letter.
6. Negotiate roles
- Compare perspectives and resolve differences as a group.
- Aim for a shared understanding of responsibilities.
7. Do a vertical analysis
- Look at each role and check balance:
- Too many R’s?
- No R’s or A’s?
- Too many A’s slowing decisions?
- Empty spaces?
8. Do a horizontal analysis
- Look at each activity:
- No R’s? Is it really getting done?
- Too many R’s or A’s?
- Overuse of C’s or I’s?
The RASCI variation
Some groups add Supportive (S) to highlight roles that provide resources or assistance.
Secret Sauce
- Assign one R-prime (R1) if multiple people are responsible, to avoid confusion.
- Use A’s sparingly – the more A’s, the slower decisions move.
- Roles can be combined if realistic (e.g. someone can be both R and A).
- Encourage negotiation – the value lies as much in the discussion as in the final chart.